Our scope of services comprised of a program of inspection and Non-Destructive Testing to identify the source of structural deterioration, designing a long-term repair solution for the affected car park deck deterioration; including concrete repair and Cathodic Protection, and providing site supervision services on the subsequent NEC3 ECC repair contract.
Hi-Park was successfully remediated by adopting a sustainable and collaborative approach throughout the repair scheme, from retaining and restoring the majority of the affected structural components to phasing the works so the business remained operational. The specification of innovative products and materials enabled a high quality, durable finish to be achieved.