Back

Abercorn Bridge

Belfast

 

Receiving an award for Excellence in Building Processes from the Concrete Society, McFarland Consulting were engaged to design and supervise the remediation of Abercorn Bridge.

 

 

Inspection, Non-Destructive Testing, Finite Element Analysis (FEA) and load testing of the 83-year-old four span bridge structure over the River Strule were undertaken, leading to the production of detailed condition, FEA and load test reports including repair specification and a Bill of Quantities (BoQ). Design and sign-off of a Cathodic Protection system and ongoing monitoring of performance.